100 kW solar power plant — ready-made solution for medium-sized businesses

A 100 kW solar power plant is a typical industrial solution for businesses with average electricity consumption. The plant produces up to 120,000 kWh per year, which can cover up to 70% of a business's electricity needs and reduce dependence on grid tariffs.

This is a proven solution for properties with a roof area of ​​600 m² and stable daytime consumption. Suitable for both grid-connected and hybrid connections with backup power.

Characteristics

System power

100 kW

Annual generation

120,000 kWh/year

Panel area

600 – 700 m²

Number of panels

200 – 220 pcs (450–550 W each)

Connection type

Grid-connected or hybrid

Service life

25+ years

Panel warranty

25 years on performance

Inverter warranty

10 years

Estimated cost

Grid-connected SPP 100 kW

from 2,800,000 UAH

Classic solution for electricity savings

Get a commercial offer

*The exact cost depends on the type of equipment, installation complexity, and system configuration

Hybrid SPP 100 kW

from 4,200,000 UAH

With battery storage for operation during blackouts

Get a commercial offer

*The exact cost depends on the type of equipment, installation complexity, and system configuration

How much you'll save with a 100 kW SPP

The plant pays off through real electricity savings. If your enterprise consumes 15,000 kWh/month at an average tariff of 5.50 UAH, the 100 kW SPP can cover up to 70% of this volume.

Without SPP (annual expenses)

15,000 kWh × 12 months × 5.50 UAH

990,000 UAH/year
With 100 kW SPP (savings)

Solar coverage: ~70% (105,000 kWh/year)

577,500 UAH/year

Grid remainder: ~30% (412,500 UAH/year)

Payback and profit

Payback:

2,800,000 UAH / 577,500 UAH = 4.8 years

Further savings (20 years):

577,500 × 20 = 11,550,000 UAH

Protection against tariff increases

Over the last 5 years, the price of electricity has increased by 180%. Your SPP generates electricity at a fixed cost for its entire service life.

I want an exact calculation for my facility

100 kW SPP — for enterprises with daily consumption of 10–20 MWh/month

This solution is optimal for medium-sized businesses with constant daily load and their own premises

Suitable for:

Warehouses and logistics centers

Refrigeration equipment, conveyors, lighting — everything runs during the day and consumes a lot of energy

Agricultural enterprises

Grain storage, farms, livestock complexes, greenhouses — high daytime consumption

Production workshops

Machine tools, equipment, ventilation — working day = consumption peak = generation peak

Gas stations and car washes

Pumps, compressors, lighting — stable daytime load throughout the year

Retail outlets and supermarkets

Refrigerators, air conditioners, lighting — consumption during working hours

Office buildings and business centers

Air conditioning, lighting, server rooms — daytime business activity

What is included in the 100 kW solar power plant kit?

A complete system is not just panels on the roof. It is a balanced set of equipment that converts sunlight into working electricity for your business.

Solar panels (200–220 pcs)
  • Brands:JA Solar / Longi / Trina Solar
  • Power:450–550W each
  • Warranty:25 years at 80%+ efficiency
  • Standard:Tier 1 manufacturers
Inverters (1–2 pcs)

Lorem ipsum dolor sit amet, consectetur adipisicing elit. Alias, animi
aspernatur aut commodi cumque deserunt doloribus eaque explicabo, facere
illo ipsa minima nam porro praesentium reiciendis tempora veniam?
Asperiores, reiciendis.

Fastening system
  • Brands:JA Solar / Longi / Trina Solar
  • Power:450–550W each
  • Warranty:25 years at 80%+ efficiency
  • Standard:Tier 1 manufacturers
Solar panels (200–220 pcs)
  • Brands:JA Solar / Longi / Trina Solar
  • Power:450–550W each
  • Warranty:25 years at 80%+ efficiency
  • Standard:Tier 1 manufacturers

Guarantees

On solar panels

25 years — for productivity (at least 80%)

On inverters

10 years (possibility of extension up to 20)

For installation work

5 years

On the mounting system

10 years

Solar power plants and solar energy systems for your enterprise

Generate your own electricity and store it for any need. Reduce your electricity costs by up to 50% and ensure a stable supply 24/7.

Get a quote

From idea to launch in 20–30 days

You get a ready-made system without the headaches of documents, suppliers, and contractors. One contractor — full responsibility.

Audit and miscalculation (1–2 days)

What we do:

  • Engineer’s visit to the site (free of charge)
  • Consumption and roof analysis
  • Estimation of savings potential

What you get:
Technical report and preliminary cost estimate

Commercial (2–3 days)

What we do:

  • Detailed system design
  • Equipment selection for your budget
  • Calculation of payback and ROI

What you get:
A full CP with prices, terms and guarantees

Contract and advance payment (1 day)

Shcho robymo:

  • EPC-kontrakt z fiksovanoyu tsinoyu
  • Hrafik robit i oplat
  • Uz·hodzhennya daty startu

Shcho otrymuyete: Yurydychni harantiyi ta chitki zobov’yazannya
218
What we do:

  • Fixed price EPC contract
  • Work schedule and payments
  • Agreement on start date

What you get:
Legal guarantees and clear obligations

Delivery and installation (15–20 days)

What we do:

  • Purchase and delivery of equipment
  • Installation of structures and panels
  • Connection of inverters and protection
  • Monitoring settings

What you get:
A ready-made system with certificates of work performed

Start-up and training (1–2 days)

What we do:

  • Connection to the enterprise network
  • Testing and debugging
  • Training your staff

What you get:
Workstation + instructions + access to monitoring

How it works in practice: a case study of a logistics center in the Kyiv region

The object is similar to yours. Real numbers, real savings, real results.

ParameterValue
Object type Warehouse logistics center
Location Kyiv region, Boryspil district
Solar power plant capacity 100 kW
Number of panels 210 pcs × 475 W
Inverter Huawei SUN2000-100KTL-M1
Panel area 650 m²
Installation type On a flat roof (ballast system)
Implementation period 22 days

Economic indicators

Indicator Before SPP After SPP Economy
Consumption/month 18,000 kWh 18,000 kWh
Coverage of SPP 12,500 kWh (70%)
Expenses/month 99,000 UAH 30,250 UAH 68,750 UAH
Expenses/year 1,188,000 UAH 363,000 UAH 825,000 UAH
Project payback
  • System cost:

    2,950,000 UAH

  • Payback:

    3.6 years

  • Savings over 20 years:

    16,500,000 UAH

A 100 kW solar power plant will fully cover this consumption and pay for itself in 2–3 years. The remaining 20+ years are pure savings.

Get a quote
Answers to the main questions about 100 kW solar power plants
How much roof space do you need?
What will happen in the event of a blackout? Will the solar power plant work?
Can I install a solar power plant on a rented building?
What about maintenance? How much does it cost?
How quickly will a solar power plant pay for itself for my facility?

Ready to discuss your project?

E-mail

General questions and CP

info@alteco.in.ua

Sales department

Mon–Fri, 9:00–18:00

+38 (067) 505 95 36

Telegram / Viber

We respond within 2 hours

info@alteco.in.ua